phone pencil envelop file-text2 link location bubbles3 printer instagram xing linkedin
IFU CERT ISO 9001
Integrationprüfung von ZZS-Einrichtungen

Integration from CCS

Train control, train command and train radio systems are subject to continuous development. If a change between the component and the vehicle / infrastructure or set of rules occurs, it must be checked and assessed. The necessary activities be summarised in the integration test.

Currently we offer integration tests for train radio and train protection systems including ETCS and have the employees with the recognition from the railway federal office (Eisenbahnbundesamt).

The integration tests are modular composed with the following points:- documentation check

  • function and visual check at the vehicle
  • test drives as an assess of the rail operationally interaction
  • approval runs with the approval authority and the infrastructure manager
  • expert valuation of the test results

The number of the necessary test points depends on the type and the extent of the change. Therefore we are able to create an individual offer for your vehicles.

Besides the test and assessment, with the IGT you have the special possibility to apply the necessary test runs with the help of our railway enterprise including the achievment from all approvals.

At the end of the process you get a integration report for submitting the railway federal office (Eisenbahn-Bundesamt).

Any further questions?

Please contact us! We are looking forward to help you.

Schaefer